Membrane modules that cut biomethane upgrading costs.

Elastia is a UK materials science company that develops and manufactures membrane modules for biomethane upgrading. The same or better performance, at a lower cost to both the EPC and the end operator.

01 What we offer

Lower costs for the EPC. Better returns for the operator.

For EPCs and procurement

  • Lower module purchase costs
  • More margin, or a sharper project price
  • Straightforward replacement, with compatibility confirmed by your team
  • We supply the modules; you keep the system design

For operators and EPC sales

  • Lower upgrading energy costs: a saving you keep every year the plant runs
  • More saleable biomethane from higher throughput
  • Better lifetime economics from lower degradation
  • Higher-value gas, where specifications and conditioning allow
  • We work with your technical team or your engineering partners, whichever is easiest

02 Performance and evidence

Cost less to buy. Cost less to run. Last longer.

Cost less to buy

20–30%

indicative reduction in module purchase cost

The same biomethane purity with approximately 30% less membrane material, which makes up most of a module's cost.

Incumbent100
Elastia70–80
Module purchase cost, incumbent = 100. Indicative; final pricing depends on the agreed specification. Not total plant capex.

Cost less to run

~20%+

lower upgrading energy costs

Better cash flow, ROI and payback, every year the plant runs. Calculated for your site.

Last longer

5,000+ h

of comparative testing logged, and ongoing

Lower performance degradation than all major competitor materials tested.

More revenue potential

99.9%+

CH₄ and CO₂ product purity, after conditioning

More saleable biomethane, and gas for higher-value applications.

Evidence from a live biomethane site

30%+ higher permeate flow than a commercial polyimide module, at 15 bar

  • Preproduction four-inch module
  • At 15 bar feed pressure
  • Comparable permeate CO₂ purity

Comparative field test at an operating biomethane plant, with both modules on the same pretreated digester gas (about 62% CH₄ / 38% CO₂). For operators, higher throughput per module could mean fewer modules, or lower operating pressure, for the same biogas flow.

Permeate flow, Nm³/h

Low · ≈6.5–6.8 bar

Elastia12.0
Commercial9.5
+26%

Medium · Elastia 11.4 / commercial 10.0 bar

Elastia34.0
Commercial23.0
+48%

High · ≈15.0–15.2 bar

Elastia46.2
Commercial35.0
+32%
Preproduction four-inch hollow-fibre module versus a four-inch commercial polyimide module, three operating points (6.5–15.2 bar feed), each shown with its feed pressures. Comparator and site not named.

Based on previous experimental and live-site results. All benefits can be achieved together, but not all figures shown at once; results depend on feed gas and configuration.

We can offer experimental and simulation data upon request →

03 Our technology

Innovative materials science, built into a module.

Built on more than a decade of UK research. We design membrane materials at the molecular level.

  • PermeabilityCO₂ passes through more easily, so less membrane does the job.
  • SelectivityA cleaner split from methane, for purer product gas.
  • DurabilityPerformance holds for longer.

We model performance against your product specification stage by stage, including oxygen.

Tailored over time. Our R&D can develop module variants for demanding site or regulatory requirements, such as meeting tight oxygen limits or minimising methane slip.

Formats. Standard 4-, 6- and 8-inch modules, with custom 12–16-inch diameters on request. End connections designed around common upgrader configurations. Replace cartridges at changeover, or run ours in parallel first.

Bio-LNG ready after polishing. Contaminant limits and technical data per size on request →

  • CO₂ · permeate
  • CH₄ · product

— Module range

Module sizes from farm sites to central plants.

Choose the module size that fits the gas flow, run modules in parallel, and add more as feedstock grows.

Elastia 4-, 6- and 8-inch membrane modules in stainless-steel housings
Spool of white hollow-fibre membrane
Hollow-fibre membrane, wound before module assembly
4-inch membrane module

Small and farm-scale sites

4-inch

Compact modules for smaller gas flows. Also suited to pilots and side-by-side trials before a full changeover.

6-inch membrane module

Mid-size sites

6-inch

For agricultural and waste sites. Several modules in parallel match capacity to the gas flow without oversizing.

8-inch membrane module

Large central plants

8-inch

Fewer, larger modules for higher gas flows.

Custom 12–16-inch diameters on request. Module size, count and stage configuration are confirmed by modelling against each site's gas flow and specification.

— From feedstock to revenue

Biomethane to sell, plus CO₂ as a second product.

Our modules separate biogas into biomethane and a CO₂-rich stream. With conditioning, that CO₂ can be sold or used.

Biogas from

  • Farm residues and manure
  • Energy crops
  • Food and organic waste
  • Sewage sludge
  • Landfill gas

Gas pretreatment

Elastia membrane modules

Biomethane

  • Grid injection
  • Transport fuel: bio-CNG, bio-LNG
  • Heat and power

CO₂ stream

  • Food and drink, greenhouses
  • Industrial use
  • CO₂ utilisation and storage

We are testing agricultural-waste biogas and landfill gas, and welcome opportunities to test across all biogas feedstocks. End uses depend on the site, gas specification and local market; CO₂ needs further conditioning for most uses.

04 Joint technical evaluation

Start with a conversation.

Start with a first technical call. We then model the business case using your site's data and agree how to test. You provide the gas data and judge the results; our scientists carry out all material development.

  1. 01

    Identify

    Meet your technical team and agree priorities and a suitable site or project.

  2. 02

    Model

    Model the business case using your site's data, after a first technical call.

  3. 03

    Test

    Agree success criteria, then test at our London laboratory, on site, or both.

  4. 04

    Agree terms

    Review performance and economics, then agree commercial terms.

For operators. Start with a metered trial alongside your existing modules, where the upgrader allows, or a swap at your next membrane changeover. We work with your EPC or OEM.

Discuss your project →

05 About Elastia

A UK materials science company.

Materials scientists and engineers, with biomethane upgrading at the centre of our work.

  1. Q3 2026Commercialisation began
  2. Q4 2026Module production started in Hangzhou
  3. Q1 2027First shipmentsPlanned
Meet the team →

— Our sites

Production in Hangzhou. Research and gas testing in London.

Factory · Hangzhou, China

Where we produce our membrane modules

Stainless-steel formulation reactors at the Hangzhou factory Module test bench with pressure gauges Module processing line in a clean room

Laboratory · UCL East, London

Where we conduct research and gas testing

UCL East Marshgate building, London Membrane separation test rig in the London laboratory Laboratory gas supply lines and regulators

06 Questions

Common questions.

Will your modules fit my upgrader?

Standard 4-, 6- and 8-inch modules, with custom 12–16-inch diameters on request. End connections are designed around common upgrader configurations, and compatibility is confirmed by your team. Replace cartridges at changeover, or run ours in parallel first.

Which module size fits my plant?

4-inch modules suit small and farm-scale sites and trials; 6-inch modules run in parallel at mid-size sites; 8-inch modules suit large central plants. Custom 12–16-inch diameters are available on request. We confirm size, count and stage configuration by modelling against your site's gas flow and specification.

How do we start?

With a first technical call. We then model the business case using your site's data, agree success criteria and test at our London laboratory, on site, or both.

Do I need to share detailed gas data?

Not to start. Detailed data can follow under NDA.

Which feedstocks are you testing?

Agricultural-waste biogas and landfill gas. We welcome opportunities to test across all biogas feedstocks.

Where is the work done?

Research and gas testing at our laboratory at UCL East, London. Modules are produced in Hangzhou, China, where module production started in Q4 2026.

Can your modules be used for bio-LNG?

Yes, after polishing. We confirm the configuration for each site.

When can you deliver?

First shipments are planned from Q1 2027.

Do all the figures apply at once?

No. All benefits can be achieved together, but not all figures shown at once; results depend on feed gas and configuration.

07 Contact

Discuss your project.

No detailed gas data needed to start. That can follow under NDA.

hello@elastialabs.com
UCL East Marshgate, 7 Sidings Street, London E20 2AEWe reply within two working days.

We use your details only to reply. See our privacy notice.

08 Looking ahead

More value from every gas stream

Biomethane upgrading is our focus today. Our wider ambition is to apply gas separation technologies to circular processes that turn waste-derived gases into valuable and sustainable energy and chemicals products.